Target and Achievement of Eleventh Five Year Plan(2007-2012)
Target & Achievement of Eleventh Plan (2007-2012)
Sl.
No.
Name of Scheme 11th Plan (Proposed Outlay) Achievement Remarks
2007-08 2008-09 2009-10 2010-11
Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy.
1 2 3 4 5 6 7 8 9 10 11 12
  2405- FISHERIES
1 Direction & Administration 2156.00 204.00 Liabilities (Sal. etc) 87.00 Liabilities (Sal. etc) 38.00 Liabilities (Sal. etc) 24.00 Liabilities (Sal. etc)  
  04-STATE PLAN SCHEMES            
2 Transportation 100.00 27.50 Maint. of vech/ Pol 23.00 Maint. of 23 nos vech / Pol 25.00 Maint. of vech/ Pol 45.00 Maint. of vech/ Pol  
                 
3 Integrated fish fish farming 15.00 2.50 651 ha (E), 100 (A) 3.00 100 (A), 3.00 140 (A) 3.00 145 (A)  
4 Construction of fish/seed farm including improvement & maint. 100.00 8.00 Maint. of farm (16 districts) 24.00 Maintenace 13.00 Maintenace 15.00 Maintenace  
                   
5 Cold water fish culture including Trout culture 50.00 1.20 Maintenance (2 dist.) 1.00 Maintenace 1.00 Maintenace 2.00 Maintenace  
                   
6 Maintenance of Beels/ Lakes etc. 100.00 1.00 Maint. of beels / lakes (3 dists.) 1.00 Maintenace 3.00 Maintenace 6.00 Maintenace  
                     
7 Misc. Schemes & other support 50.00 4.50 Hq. / districts 3.00 Minor works, Computer 6.00 Minor works, IT equip. 17.00 Minor works, IT equip.  
  109-EXTN. & TRG.              
8 Fisheries Extension Programme 70.00 1.30 Stipend, Pub., Adv. 1.00 Stipend 1.00 Stipend 11.00 Stipend  
  800-OTHER EXPDR.
9 Buildings 100.00 ~ ~ 20.00 4 building ~ ~ 63.00 Maint.  
  Total 2741.00 250.00   163.00   90.00   186.00    
  Centrally Sponsored Schemes(CSS)
10 Development of Fresh Water aquaculture (through FFDA) (S/Share) 101.00 1.00 50 ha, 100 trg. 14.00 50 ha, 100 trg. 14.00 50 ha, 100 trg. 38.00 50 ha, 100 trg.  
  (S/share)                  
11 National scheme of Fishermen Welfare   ~ ~ 64.00 32 houses 100.00 640 houses 100.00 640 houses  
                     
11 Fisheries Training & Extension 3.00 ~ ~ 1.00 Pub/ meeting/Tr 1.00 Pub./ meeting 4.00 Pub./ meetin  
12 Coldwater Aquaculture 15.00 ~ ~ ~ ~ ~ ~      
  Total 119.00 1.00   79.00   115.00   142.00    
                Contd. to P/2
                 
  Page -2-
   
  Scheme fully funded by GOI
1 Strengthening of database & information networking in Fisheries Sector ~ 13.80 Catch asses. in 4 dists. 14.00 Sal. / Collection of data 10.00 Sal. / Collection of data      
               
                     
2 Esstt. of Post Harvest Infrastructure in Fisheries Sector ~ 50.00 2 districts ~ ~ ~ ~   ~  
                     
      63.80   14.00   10.00        
  NEW SCHEMES
1 Construction of Aquairum House & awerness centre 50.00 ~ ~ 20.00 1 no. ~ ~   ~  
                     
2 Freshwater Prawn culture including Hatchery 31.00 ~ ~ ~ ~ ~ ~   ~  
                     
3 Fee mixing plant specially for CWF 10.00 ~ ~ ~ ~ ~ ~   ~  
4 Net weaving centre with womens participation 10.00 ~ ~ ~ ~ ~ ~   ~  
                     
5 Ornamental fish culture 25.00 ~ ~ ~ ~ ~ ~   ~  
6 Fishereis Training Centre 100.00 ~ ~ ~ ~ ~ ~   ~  
  Total 226.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00    
  Grand Total 3086.00 314.80 0.00 276.00 0.00 205.00 0.00 328.00 0.00 1123.80